Buchanan Highway Roadworks

The following roadworks are planned for the Buchanan Highway, before the end of November 2024.
A new culvert installed at the mud pit (5 km after the turn-off), it will also have a concrete floodway over the top.

The sealed section outside of VRD will be repaired and resealed.
The gate on the road to Yarralin (at the Buchanan Highway turn-off) will be replaced with a grid.
Repair to flood damaged sections from Victoria Hwy intersection to Dashwood intersection.
Plans to repair flood damaged sections between Dashwood Crossing to Top Springs.

These works, along with increased food stored at the store will hopefully see us get through the wet season in better condition.